Key data

  • Client: Betrieb für Bau und Liegenschaften M-V, GB Rostock
  • Construction: 2008 – 2014
  • Contract price: 36.9 million euro
  • Scope of planning:

    Structural design 

     

    Preliminary design 
    Design development 
    Approval design 
    Detailed design 
    Preparation of tender documents 

Competitions

Surgery University Hospital, Rostock
Renovation of a heritage-protected building

The building complex, originally planned in 1914, was built in 1929 and entered into service in 1930. The imposing west wing, with the original main entrance and the auditorium, is situated between the virtually identical north and south wings. The entire building has three levels, including basement, of masonry construction, and an upgraded attic level.

Particular challenges associated with the renovation of this heritage-protected building included inadequate as-built/as-modified documentation, the discovery of hazardous materials, the positioning of the new spiral staircase in the foyer, and the reconstruction of the auditorium in a manner befitting the building’s protected status. 

Gross floor area: approx. 14,130 m² 