Leibniz Institute, Germany
New building for Homogeneous Catalysis
A new institute building was constructed in several stages on the campus of the University of Rostock. The four-storey building has no basement, but has a top level of smaller area, set back from the façade. Much of the building is devoted to laboratory work, with work stations, preparation areas and evaluation rooms. Office and administration space, seminar and lecture rooms and workshops are also provided. Due to their main function for preparative and analytical laboratory work, the facilities have a particularly high degree of installation density.
Client
Leibniz Institute for Catalysis at the University of RostockPlanning
Phase 1: 2002-2005; Phase 2: 2005-2009; Phase 3: 2011-2014; Phase 4: 2017-2020Planning Scope
Technical building equipment (Service phases 1-8)