Key data

  • Client: Universitätsklinikum Rostock AöR
  • Construction: 2009 - 2014
  • Contract price: approx. 160 million euro
  • Scope of planning:

    Project management 

     

    Preliminary design 
    Approval design 
    Detailed design 
    Preparation of tender documents
    Site supervision 

Competitions

Modernisation University Hospital, Rostock

The university hospital on the “Schillingallee campus” has recently been developed into a modern centre for patient care, research and teaching. In a first phase, while maintaining uninterrupted hospital operations, the following measures were implemented within a very tight timeframe:

  • Construction of a three-storey building as a future centre for campus supply and disposal processes
  • Reconstruction and renovation of the three parts of the surgical hospital’s heritage-protected main building
  • Construction of the Central Medical Functions building, with three upper floors and a basement, to house almost all of the hospital’s highly specialised departments and a number of wards and services
  • Interconnection of various departments and locations by means of an automatic package transport system and a pneumatic tube conveying system
  • A geothermal plant, as a basis for a “green hospital”