Key data

  • Client: MHB Planungs- und Ingenieurgesellschaft
  • Planning: 2002 - 2006
  • Construction: 2005 - 2008
  • Contract price: 32 million euro
  • Scope of planning:

    Preliminary design
    Design development
    Approval design
    Ausführungsplanung
    Preparation of tender documents
    Site supervision 

    Aspects covered:
    Heating
    Ventilation / Air conditioning
    Sanitary facilities
    Medical gases
    Building management system 
    Electrical engineering 
    Elevator technology             

Competitions

Müritz Hospital, Waren
Natural air conditioning using geothermal energy

This project involved the renovation and extension of the hospital’s ward block to 170 beds, the construction of a new building with six operating theatres, ancillary rooms and laboratories and the construction of another building with kitchen and administration facilities. Inros Lackner was responsible for planning and designing the complete provision of the building complex with the required technical equipment. This included, most notably, the natural air-conditioning of the new buildings using geothermal energy – for cooling, and, in combination with a heat pump, for heating.

Aerial picture / MediClin Müritz