Key data

  • Client: ENERCON GmbH
  • Planning: 2012 - 2013
  • Construction: 2013
  • Contract price: 0.67 million euro
  • Scope of planning:

    Preliminary design
    Design development
    Approval design
    Detailed design
    Preparation of tender documents

    Services: 
    Structural design 
    Project design 
    Cost estimation
    Bill of quantities

Altentreptow-Nord substation, Mecklenburg-Vorpommern
Construction of new transformer station

The goal of the project was to connect a wind park into the 50hertz transmission network. In order to receive the generated power, the new Altentreptow-Nord substation was connected to the existing 380 kV line between Lubmin and Neuenhagen. In connection with the building of the new transformer station, a new operations building, gateway and equipment foundations, foundations for neutral earthing points, cable ducting and a drainage system were newly constructed.