Key data

  • Client: VASA Kraftwerke GmbH & Co. Lubmin KG
  • Scope of planning:

    Landscape management planning 
    Supplement to environmental impact assessment
    FFH (flora-fauna-habitat) impact assessment
    Preparation and support of planning approval procedure
    Technical planning of replacement measures

“Nordal” high-pressure gas pipeline, Lubmin
Planning approval procedure

To meet the supply needs of a new gas and steam power generating station in Lubmin, the construction of a buried high-pressure gas pipeline of diameter 800 mm and length 210 km was required. The pipeline connects to the existing gas pipeline network in the Berlin area, and follows an ecologically optimised route through the states of Brandenburg and Mecklenburg-Vorpommern. To support this project, Inros Lackner implemented a planning approval procedure in accordance with the German energy industry law EnWG § 11 a. 