Wolmirstedt substation, Sachsen-Anhalt
Renewal of a 380 kV facility
In Wolmirstedt substation, the existing 380 kV switchgear is being renewed and upgraded. The works include the dismantling of old facilities and the installation of 18 switchgear units, with a transformer site, an operations building, relay stations, cable ducting and a large precipitator. Factory roads and supply/disposal pipes are also being laid. Ground levelling is required for the extension area for the new 380 kV switchgear.
The work is being carried out in two phases. For the construction site clearance, temporary solutions are being provided. In addition to project planning and structural design for the constructed facilities, Inros Lackner’s scope of work also includes the creation of a landscape management plan.