Spremberg Spree Bridge
Due to significant structural damage, the Spree Bridge – a seven-span reinforced concrete bridge in Spremberg – was closed, and a replacement structure (total span length 57.3 m) with just one central pier was constructed across the Spree river. The project's objective was to create a safe, durable and environmentally sound connection for pedestrian and cycle traffic. The design of the new bridge took special account of flood protection and nature conservation considerations. It was built as an aluminium truss structure, offering several advantages – its light weight facilitating construction and reducing environmental impact, while the design will also help achieve a long service life with low maintenance costs.
Client
Stadtverwaltung SprembergPlanning
2020 - 2027 (2022 - 2027 LP 9)Realization
2021 – 2022Planning Scope
Project design (HOAI phases 1-9) and structural design (HOAI phases 1-6)