Skip to main content

Federal freeway A14, MV

Closing the gap between Schwerin and Magdeburg

Inros Lackner is largely responsible for the new construction of the A14 federal highway in MV. It closes an existing gap in the federal German highway network and represents an important link in the Trans-European Transport Network (TEN) as well as for the neighboring structurally weak regions and the North German Baltic Sea ports. In addition, it assumes a relief function for the A 7, A 9 and A 10 freeways. The final southern 11 km construction section in the MV to Brandenburg planning area was opened to traffic at the end of 2017. Inros Lackner was responsible for various subsections with design and construction supervision services. Several bridge structures were planned, including the 506 m long semi-integral Elde Valley Bridge as well as various noise and collision protection facilities and traffic installations.

Client

Straßenbauamt Schwerin

Planning

ab 2005

Realization

2010-2017

Planning Scope

Basic evaluation, preliminary planning, draft design and approval planning, participation in awarding contracts