Road Rehabilitation, Togo
The road network in the Port of Lomé was constructed in the 1960s. However, for over 40 years, there has been minimal investment and maintenance. Due to a substantial growth in commercial exchanges and a significant increase in cargo volume, the road pavement has deteriorated significantly, necessitating urgent rehabilitation work. Inros Lackne Togo was commissioned by the port authority with the design and supervision of these rehabilitation works. In total, approximately 7 kilometers of paved road will undergo restoration, which includes the implementation of a new water management system, upgraded lighting, and the installation of a toll booth system for both vehicle entry and exit.
Client
Port Autonome de LoméPlanning
2016-2019Planning Scope
Preliminary design, detailed design, tender and procurement phase, construction supervision