Storm surge protection, Usedom

Flood protection measures

As part of the storm surge protection in the north of the island of Usedom, the villages of Karlshagen and Peenemünde will each be protected against a design flood by a ring dyke. In addition to the technical planning of a total of approx. 4,200 m of protective dyke, the environmental approval documents were also prepared. In addition to the technical planning for approx. 4,200 m of protective dyke, the environmental approval documents were also prepared. These include the landscape conservation plan, the environmental impact study, Natura 2000 reports, species protection reports, applications for exceptions for biotope protection and forest conversion. The challenge with this project, in addition to the environmental implementation within the procedure, was to support the client in the early public participation due to the local conditions and the large number of different interests (local residents, monument protection, forestry, etc.).

Client

Staatliches Amt für Landwirtschaft und Umwelt Vorpommern

Planning

2016-2021

Realization

ab 2024

Planning Scope

LBP, scoping, UVS, nature conservation variant comparison, ecological mapping, FFH/SPA preliminary assessments, FFH-VP, AFB, early public participation, application for forest conversion, support for planning approval procedure