Key data

  • Client: Hansestadt Lübeck, Lübecker Hafengesellschaft
  • Planning: 1998-2000
  • Construction: 1999-2000
  • Scope of planning:

    Feasibility study
    Design development 
    Approval design 
    Detailed design 
    Preparation and participation in contract award  
    Site supervision 

Skandinavienkai ferry dock, Lübeck
Ro-Ro facility with main deck and upper deck loading ramps

Steadily growing freight volumes at the Skandinavienkai terminal in the port of Lübeck required docking capacities to be increased through a combination of dismantling, modernisation and replacement of existing docking facilities. The technical requirements for the new facilities stemmed primarily from the increasing ship sizes and necessary reductions in standing times. The implemented solution involved the construction of a Ro-Ro (roll-on/roll-off) facility with a welded steelwork double-deck loading ramp. This facilitates simultaneous loading to both the main deck and the upper deck.