Key data

  • Client: Staatliches Amt für Umwelt und Natur Rostock
  • Planning: 2006 - 2008
  • Construction: Commenced 2007
  • Scope of planning:

    Design development
    Detailed design
    Contract tendering and award
    Site supervision
    Contract management
    Project management

     

Stormwater protection, Baltic Sea
Construction of sea dyke

This project involved the planning and design work for the construction of a new flood protection embankment (approx. 2.2 km long) and a new sea dyke (section of length 2.8 km). The total length of the sea dyke is approximately 10 km. The structures were designed with reference to the applicable geotechnical report, with dyke defence and agricultural pathways, a cycle path and nine paved crossings incorporated. The existing ditch system was also modified.