Landshut–Plattling railway line upgrade

A second track for increased capacity

Railway line 5634 between Landshut/Isar and Plattling is part of a key connection between Munich, Regensburg and Passau in Bavaria. Due to high passenger numbers, the single-track sections result in operational bottlenecks which will be addressed by various measures including a double-track upgrade between Wörth (Isar) and Loiching. Inros Lackner is responsible for the structural and technical planning for this project, using BIM methodology. Our services include route planning, the adaptation of bridges, culverts and level crossings, and the coordination of planning and design services for overhead contact lines, electrical power supply and signalling technology.

Client

DB InfraGO AG, GB Fahrweg, München

Planning

2025 – 2029

Realization

voraussichtlich 2030 – 2032

Planning Scope

Design and permitting, and optionally tendering and awarding of contracts