BESS sites, Germany
This project involved the development of transportation and infrastructure proposals for a number of large-scale battery energy storage system (BESS) sites in Nordrhein-Westfalen and Baden-Württemberg for clients NEW Netz GmbH and Drees & Sommer SE. In particular, it included the planning and design of external and internal access to the sites, taking into account the requirements of future operation as well as the construction and plant-installation phases. A key focus was on the delivery to site of the energy storage containers by heavy transport vehicles, also involving the use of large cranes.
To ensure proper access, transport infrastructure and manoeuvring proposals were developed and the suitability for use by heavy transport vehicles, fire engines and maintenance vehicles was demonstrated with the help of turning-curve analyses. Suitable surfaces for positioning of cranes were also planned, and necessary adjustments to existing roads were assessed. The developed plans form an essential basis for the permitting process.
Client
NEW Netz GmbH (Wegberg und Mönchengladbach-Rheindahlen) , Drees & Sommer SE (Leingarten)Planning
since 2026Planning Scope
Preliminary design
Driveability checks involving dynamic turning-curve analysis
Crane positioning and movement planning
Permitting requirements