In 2016, Inros Lackner Cambodia was contracted by Chip Mong Insee Cement Corporation to conduct a Water Management Study for the construction of a cement plant. The study included a desk review, field survey (aerial photogrammetry, hydraulic survey, and field reconnaissance), and the development of a comprehensive water management concept. This concept assessed water demand for plant operations and other uses, comparing it to available supply, and provided recommendations for water monitoring and environmental management.
Additionally, existing designs for water supply, stormwater, and wastewater drainage systems were reviewed using hydrodynamic analysis, leading to proposed design adjustments. A key recommendation was to control the water level in a rainwater storage pond by constructing an injection well and a spillway. In 2018, the client commissioned Inros Lackner Cambodia to develop the detailed design for these structures.
Auftraggeber
CMIC Cement PlantPlanung
2016Realisierung
2016Planungsumfang
Desk study, field survey, concept design